BUILDING

STRONGBACKS

I'm serious about T strongbacks, spread the word: quit building them,
they twist. The perfect strongback is one of my designs, naturally.

A 14' strongback requires two 2x4" rails 10-12' long, a 1x6" 14' long
(preferably one piece), and several short pieces of 2x4's. (On a 17' strong-
back the rails should be about 14' long.) None of the lumber need be new,
but it should be reasonably straight and sound. The 1x6 surface board should
be clean enough that pencil marks will show.

Start with the two rails. Place any bends opposite and set them ona
flat surface; the floor works fine. Insert a three-to-four-foot length of 2x4
between the rails near each end. Slide these 2x4's outward equally until the
desired strongback length is reached. Drill and bolt this assembly—at least
two bolts at each end.

Next we want to build sockets for the legs. Each of the two legs is T-
shaped and made of 2x4's. To get the socket, insert a short chunk of 2x4
between the rails and at a right angle to their long dimension. Slide it up to
the end piece. Then slide another 2x4 about a foot long up against the
vertical one. Drill and bolt it in place. Remove the vertical 2x4 and,
presto, a socket.

When both sockets are built, split the space between them and bolt in
one or two short chunks of 2x4 as spacers. These help keep the rails
parallel.

Each leg is a 2x4 36" to 40" long with a shorter piece 18" to 24" nailed
across one end. This forms a T (which acts as a foot on the leg). Nail on a
plywood gusset and you have a very servicable leg. The height of the
strongback can be reduced by trimming off material. Wheels can be
installed to one leg making the assembly easier to move about.

Set the strongback up on its legs and lay the 1x6 on top of it. Center
it and tack it loosely. We want to create a flat working surface, so eyeball
this 1x6—some shimming may be necessary. I use tapered wood shingles as
shims. They should be inserted below the 1x6 anywhere that it is low. These
shingles should slide until the 1x6 is brought up to grade. When satisfied,
nail it down with six-penny nails, keeping an eye on things as you nail.

Your strongback is basically complete. It should be adjusted to get the
top somewhere between waist and elbow height.

Don't assume that your new strongback is straight—you need a center
line. You may simply snap a chalk line down the center, or you may prefer
to stretch a string down the center of the plank and spray paint over it. This
popular method leaves a good clean line when the string is removed.

I have a surprise for those of you who have read this all before. I
change. I have to be shown, but I will change. So what's new? I no longer
shim my forms to true them—there is a better way. I fasten 2x2's about a
foot long to the strongback using lag screws.

Lay out all the dimensions given and draw a line, perpendicular to the
center line, across the strongback at each station. This line tells where the
outer edge of each form should sit (where the strips will make contact with
the form). Fasten the 2x2 accordingly.