Builders Corner
by Bob Brown
1x6 TOP PIECE
oe
ae CONTINIOUS T
NECESSARY
Summer is winding down. Soon it will be time to put
away your paddles and start a winter project.
Hopefully, after playing on the water all summer you
have decided on your next project.
2x4 END im
The first thing you will need building a canoe is a 00S TIMEESS Gad)
good strongback. If your plans give strongback 2x4 LEG
details, you may well follow these specs; however, I've
found some designers whose strongbacks are definitely
overkill.
2x4SPACER
PLYWOOD GUSSET
STRONGBACK DETAIL 2x4 BASE
f
I like to build a strongback only heavy enough to do ONE END
the job. I like to see it built so it is easy to store
and transport. No reason to build a full workbench
when a couple 2x4's will do.
The strongback that I've drawn will do the job quite
well. Mine is made from a 1x6 about the length of the low points. Big errors are corrected with pairs
the boat, two 2x4's about two feet shorter, and a few of shingles driven in from opposite sides. When you're
short pieces of 2x4. I use 1/4" threaded stock and 100% satisfied you have a flat surface, drive home
nuts to custom build the long bolts needed to the nails holding the 1x6 on and trim off the ends of
sandwich three thicknesses of 2x4. Use large flat the shingles.
washers, and your strongback will bolt up quite firmly.
Snap a chalk line down the center of the top, and you
None of the lumber used in your strongback needs to have a finished strongback. I like to pencil over the
be new. It must, however, be sound and as straight chalk line for a more permanent mark. You now have
as possible. The 1x6 should be clean enough so your a flat surface and a straight base line to begin
pencil marks will show when you do your layout work. installing forms.
When assembling the strongback, take your straight Next month, Il discuss making and installing forms.
2x4's and eyeball them. They probably both have a Until then, get out one more time before the lake
bend. Use these bends to counteract against each freezes.
other.
Lay these long 2x4's on a flat surface with the bends
opposite and insert between them the ends sections,
shorter 2x4's, The inner end of these end pieces
should be squared and installed about a fourth of the
way in from the ends of the finished strongback.
When satisfied, clamp together, then drill and bolt.
Use at least two bolts per end as far apart as
practical.
Next step is to make sockets to hold the legs. Use a
2x4 block and insert. it between the long timbers.
This piece is a spacer representing a leg. It should
be pushed firmly against the inner end of the end
section. A 10-12" piece of 2x4 is installed parallel to
the long timbers and pushed up snugly against the
spacer. This short piece is drilled and bolted.
Remove your spacer and you have a perfect socket to
fit a 2x4 leg. Repeat on the other end.
Install one or two more short blocks between the long
timbers to help stabilize them.
The legs are simply 2x4 tees with a plywood gusset to
stiffen the joint. They can be made slightly long and
Ee tan emits gon cana Lijoying Wiater ia Minnesota starts
ne Y "8 Here? MIDWEST MOUNTAINEERING
Take your assembled 2x4 parts and eyeball the . a.
surface. Take any up and down bend and put it up. Town Squre, St. Paul 221-1972 Open til 9M, Th, Sun. 12-5
Lay your 1x6 on this surface clean side up and tack 309 Cedar Ave. So. Mpis 339-3433 Open Weekdays til 9
it on (do not drive nails home yet). Install your legs
in the sockets and give the assembly a real careful sniaialiiciiii
look-over. Law
CANOES XC SKIS * CUMBING SEAR
Any waviness in the top surface can be removed by ASK US WE'VE BEEN THERE
driving wood shingles between the 2x4's and 1x6 at 13