Tips on Building Whitewater Boats by Larry Johns

Continued from September HUT.

My general procedure when
building a kayak is to clean and
wax the mold starting around

7:00 p.m. Friday evening, then
lay up the gel coat in both halves
of the mold, finishing about
10:00 p.m. | start the layup at
8:00 a.m. Saturday and finish
about noon. It will normally be
ready for trimming, clamping,
and seaming in about five hours.
If you trim at just the right time,
it will take no more than half an
hour—the same for clamping the
halves together, and you should
be ready to seam about 7:00
p.m. | wet out all three layers of
seam tape at one time, doing
this on the floor. | use 7-.oot
lengths and let them get a little
tacky before putting them in the
boat. It should take about an
hour to wet out the strips and
position them. Wait two hours,
turn the boat and do the other
side, and your boat is locked up
and seamed before midnight.
This schedule is practical only if
you can keep your building room
at 60-65 degrees Friday night ;
and can warm it up to around 75 Residual resin rhapsody. Outward manifesta-
degrees when you do the layup. tions: inability to open eyes, fingers fall off.

HUT Magazine is no longer
forwarded to members. So if
vou didn’t get this HUT,
guess who’s to blame for not
sending a change of address
notice?

ATTENTION!
PLEASE NOTIFY THE MCA OF YOUR ADDRESS CHANGES SO THAT THE NEWSLETTER CAN REACH YOU

UNINTERRUPTED. IT WILL ALSO SAVE US ADDITIONAL TIME AND POSTAGE. SEND CHANGES TO: MCA BOX
111y, UNIVERSITY STATION, MINNEAPOLIS, MN 55414.

Pearce ‘

Article contents & approved summaries (0)

No article summaries are available for this view.